01/25/2026
I didn’t realize it’s been a few months since I made a post. Been busy this fall, still working on Parks Gap while doing a few other jobs. I was able to get the reclaimed T/G Douglas fir on the ceiling with a coat of tung oil. Lights installed with a medallion for an extra touch. Concrete floors polished, before going to work on the retaining wall and pad. Quick driveway repair at the Woods, then a request for a challenging driveway and pad at the top of the mountain, on a rock crop for a future tiny home. Excavated site for an underground propane tank along with conduit for fuel lines. Small pad at Parks Gap for the Airstream. A trip with Davis to Long Island NY to pick up an auction deal. Lol. He was letting it all out coming across the GW bridge. Then a few weeks in the shop to work on the bar and table for Parks Gap.