08/13/2026
Here’s a look at our work at Habitat Workspace.
Our plaster team delivered exceptional craftsmanship throughout the lobby, applying Venetian plaster to create a refined and elegant finish. They also applied a raked-texture plaster using a custom-made notched trowel, achieving perfectly straight, evenly spaced lines with remarkable precision. The same technique was then carried over to the front desk, creating a seamless and cohesive design that complemented the plastered feature wall.
Our drywall team completed the interior wall systems throughout all floors, ensuring high-quality finishes across the project.
In addition, our division 10 specialties team installed restroom partitions and accessories, locker room shower accessories, lockers, and a variety of other specialty items, contributing to the functionality and overall completion of the building.
Great job to all teams involved!