VMModern

VMModern Full service construction company specializing in remodeling, new construction and commercial construction. Veteran owned and operated. Insured.

Installed a precast concrete pool today. Plumbing is done, AC is finishing up tomorrow, electric will be done by the end...
08/17/2026

Installed a precast concrete pool today. Plumbing is done, AC is finishing up tomorrow, electric will be done by the end of the week. Doors and windows are in. Sheetrock already delivered. Masons started laying stone today. Stucco starting tomorrow. Septic on Friday. Definitely catching up. This is week four since the foundation was poured.
This is going to be a master class at delivering ahead of time.

Better pictures from my recent project. Great floorplan, lots of custom features. Definitely built to impress while stil...
08/11/2026

Better pictures from my recent project. Great floorplan, lots of custom features. Definitely built to impress while still very practical. On the market for sale.

Gaining speed after a month-long setback due to issues with the steel contractor. Third floor and roof next week followe...
08/01/2026

Gaining speed after a month-long setback due to issues with the steel contractor. Third floor and roof next week followed by sheathing and windows. Cantilever 10' into the driveway, massive steel beams supporting it - no room for mistake and every engineering detail matters now. Will have to push it faster than humanly possibly to complete by the end of the year. Utilities are all connected

Not bad progress in one week. Windows are already on site, roofing tomorrow, driveway and the rest of the decking by eob...
07/31/2026

Not bad progress in one week. Windows are already on site, roofing tomorrow, driveway and the rest of the decking by eob today.

Clearing 5 lots on the same street at the same time, gaining speed at the Medical District Phase II project. All 10 unit...
07/21/2026

Clearing 5 lots on the same street at the same time, gaining speed at the Medical District Phase II project. All 10 units that will be replacing these are 3br 3.5br and about 2200 SQ.f. each. Cutting down 70y old trees, improving infrastructure - electric posts, transformers, cable, sewer, ext.

Building on the highest point elevation lot at the Peninsula. Keeping the freshly poured foundation wet for the first fe...
07/21/2026

Building on the highest point elevation lot at the Peninsula. Keeping the freshly poured foundation wet for the first few days to prevent cracking on 100+ degrees heat. Installing another Plungie pool here in two weeks - a lot more efficient than after the end of construction. The full lumber package is already here, windows ready. This one is going to go up fast. Stripping forms and grading and setting the forms for the approach today as well.

One more duplex out of those completed earlier this year. One side is still available for long term rent. 3500/mo. Right...
07/17/2026

One more duplex out of those completed earlier this year. One side is still available for long term rent. 3500/mo. Right behind UT Southwestern. 1900 SQ.F. Really nice unit.

One of the 8 duplexes I built earlier this year by UT Southwestern. Building one more on that street and starting a new ...
07/15/2026

One of the 8 duplexes I built earlier this year by UT Southwestern. Building one more on that street and starting a new stage on the next street. 5 houses are scheduled for demolition for the next week.

Final finishing touches going in. Came out pretty good. What do you think? Professional pictures are coming. Too many cu...
07/15/2026

Final finishing touches going in. Came out pretty good. What do you think? Professional pictures are coming. Too many custom features to list. 4200 SQ.f. of luxury. On a market for $2,175000

Finally poured the foundation for this new 5-unit condo building. Challenging lot - over 10' drop front to back of the l...
05/27/2026

Finally poured the foundation for this new 5-unit condo building. Challenging lot - over 10' drop front to back of the lot. Having to build a series of retaining walls. This one will also have the 10' cantilever. Steel beams are coming in this week before we start the stick frame on top of it. Will try my best to deliver by the end of the year. Great investment product. Close to uptown Dallas and Medical District

Address

122 Rose Lane, #1202
Frisco, TX
75034

Alerts

Be the first to know and let us send you an email when VMModern posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to VMModern:

Shortcuts

Share