Hewitt Masonry LLC

Hewitt Masonry LLC Registered & Insured
Specializing in historic restorations
and high-quality finishing

⚒️ A Wall for the WeekendWrapped up this dry stack natural fieldstone garden wall today, just in time for a wedding bein...
08/31/2026

⚒️ A Wall for the Weekend

Wrapped up this dry stack natural fieldstone garden wall today, just in time for a wedding being held here this weekend.

The goal was to create a natural border that complemented the existing garden, with the greatest mass concentrated through the center to follow the shape and elevation of the planting bed.

I started by excavating down to solid virgin clay and thoroughly compacting the subgrade twice. I followed with a compacted aggregate base, also thoroughly packed twice, before beginning the stonework.

From there, every piece of fieldstone was individually selected, fitted, and stacked by hand. With natural stone, the material ultimately dictates the finished composition. Every piece is different, and the challenge is finding where each one belongs while maintaining solid bearing, overlapping joints, and a cohesive finished profile.

The result is a simple, rustic wall that feels right at home in the landscape. A wedding ceremony will take place just beyond the garden this weekend, putting the new stonework right alongside the setting where the couple will tie the knot.

Pretty damn cool knowing something I built today will become a small part of the backdrop to somebody else’s very big day.

Grateful for the opportunity and the trust. 🎊

⚒️ Connection CompleteWhat began as an open concrete transition on a slight slope between two established outdoor spaces...
08/26/2026

⚒️ Connection Complete

What began as an open concrete transition on a slight slope between two established outdoor spaces has now become a fully integrated custom bluestone connector.

The layout began with a cross-section reference taken from the back patio, providing a basis for stone selection, joint proportions, and the overall pattern. From that starting point, the field was developed cleanly from end to end, with the layout carried in a manner complementary to the X and Y axes of the house and the surrounding stonework.

Within that framework, geometry became the defining feature of the connector. Squares and rectangles provide structure through the field, while triangles, tapered pieces, long points, and custom cuts negotiate the changing angles along the perimeter. Sweeping arcs carry the surrounding masonry lines through the installation, allowing dozens of individually shaped stones to resolve into one cohesive composition.

Each transition required careful control of fit, elevation, and joint placement while accounting for the natural variation inherent in dimensional bluestone. Final adjustments refined the joint lines without sacrificing the proportions, points, and curves established during fabrication and setting.

Today, the entire connector was pointed in one continuous operation. The finished joints define the pattern, reinforce the geometry, and visually unite the individual pieces while preserving the natural character of the stone.

The result is a purpose-built connection shaped around the architecture, existing masonry, and landscape, allowing the new work to feel like a natural extension of the property.

Tomorrow I’ll return for a final cleanup and inspection of the completed area.

My sincere thanks to my clients for their continued trust and for the opportunity to continue building upon the work we’ve completed together. 💫

⚒️ Dialing It InToday brought the bluestone connector through its final stages of fitting and setting.The remaining piec...
08/25/2026

⚒️ Dialing It In

Today brought the bluestone connector through its final stages of fitting and setting.

The remaining pieces were set, completing the field and closing the transitions around the curved garden wall and existing patio. From there, I worked systematically through the new installation, refining joint widths, correcting tight intersections, and making the final adjustments necessary for proper pointing.

Particular attention went into the curved perimeter, where small corrections were made to maintain clean, consistent spacing along the arcs without compromising the carefully fitted stonework. Several field joints received similar attention where needed.

With the fitting, setting, and joint preparation complete, the entire connector is ready for pointing tomorrow, when the joints will bring it all together. ⚙️💎🎯

⚒️ Custom Bluestone Terrace Connection | Setting the TransitionsA really productive day on the bluestone connector.Twent...
08/24/2026

⚒️ Custom Bluestone Terrace Connection | Setting the Transitions

A really productive day on the bluestone connector.

Twenty individually fitted pieces were set today, working through the transitions one stone at a time and bringing the entire layout together.

With so many custom shapes meeting existing stonework, curved borders, steps, and the garden wall, every piece has its own personality. Some required substantial mortar beds, others needed very little, and each one had to be carefully adjusted to keep the finished surface flowing naturally throughout.

By the end of the day, the transformation was pretty dramatic. The field is established, the curves are reading beautifully, and only six pieces remain to be set.

A handful of the tighter joints will get some final attention before repointing begins, but the stonework itself came together exceptionally well.

The client happened to catch today’s progress toward the end of the day and is very pleased with how everything is taking shape. 🧩📐🎯

⚒️ Custom Bluestone Terrace Connection | Final Fabrication CompleteToday started with the remaining transition pieces be...
08/21/2026

⚒️ Custom Bluestone Terrace Connection | Final Fabrication Complete

Today started with the remaining transition pieces being templated, cut, and dry-fitted from the stock already on site.

From there, I worked through the entire balance of the layout, creating and checking 15 final templates for the remaining perimeter and transition stones. Once those were complete, I laid out the templates alongside every usable remnant, matched each one to suitable existing stock, and isolated the handful that required longer material.

A quick quarry run supplied the final pieces needed. Each template was checked directly against the new stone before purchase, then brought back to the site for fabrication.

By the end of the day, all 15 remaining stones had been cut and dry-fitted into place.

The curves, tapered transitions, point-to-point intersections, and larger closing pieces all came together cleanly, with the layout now fully resolved in stone.

Monday will be focused on final trimming, elevation adjustments, setting, and joint preparation.

A very satisfying day of careful layout, efficient material use, and focused cutting. 🪨

⚒️ TransitionsToday I began working through the transition pieces that carry the established field pattern into the curv...
08/20/2026

⚒️ Transitions

Today I began working through the transition pieces that carry the established field pattern into the curved perimeter, garden wall, and the two sets of steps surrounding the connector.@

Roughly half a dozen additional pieces were templated, traced, cut, and dry-fitted, with several of the more straightforward transitions resolving very nicely. I used Ram Board again to transfer the irregular curves and profiles onto the stone, much as I did when fabricating the perimeter pieces earlier in the project.

At this stage, sequence becomes increasingly important. Rather than cutting and setting pieces in isolation, I’m dry-fitting several moves ahead to maintain the established pattern, control joint spacing, and avoid allowing one decision to unnecessarily limit the next. The objective is to carry the integrity of the field through the transitions rather than simply fill the remaining spaces.

The wide stair riser presents another useful opportunity. Several of the remaining transitions there break naturally into triangular shapes, which should allow me to make good use of suitable cutoffs generated from the larger perimeter pieces. It’s an efficient use of the remaining material while still allowing each piece to be fitted specifically to its location.

A few larger transition pieces still need to be resolved before the final infill cuts can be made, but the overall pattern is established and the remaining stone is steadily taking shape. Rain shortened the day, but it was still a productive morning of fitting and fabrication. 📏✂️⚙️🪨

⚒️ Field FilledToday was a good day.With the layout established, I spent the day setting the remaining field stones, wor...
08/19/2026

⚒️ Field Filled

Today was a good day.

With the layout established, I spent the day setting the remaining field stones, working from the sections already completed and gradually making my way toward the perimeter. After all the measuring, moving, and rearranging that went into the dry layout, it was satisfying to settle into the work and watch the connector take shape.

The stone itself continues to look better as more of it is set. There is a broad range of color — blue-gray, green-gray, purple, buff, brown, and the occasional warmer rust tone — along with enough variation in size and texture to keep the pattern interesting without making it busy. I had only so much control over where every color ultimately landed, but looking across the connector at the end of the day, the distribution feels remarkably well balanced.

The setting went smoothly. I worked my way through the larger pieces, squares, rectangles, and smaller bookends while keeping an eye on the joints and elevations as I went. By late afternoon, I had set all of the pieces that could be set before dealing with the perimeter, completing the field. I blew off the loose mortar and debris, sponged off the stone, staged the remaining pieces near the areas where they are most likely to be used, and kept the overall job site tidy.

At this point, the nature of the job has changed. The broad layout decisions are behind me, and several of the simpler transitions into the perimeter have already been resolved. What remains are the more involved transition pieces needed to reconcile the straight lines of the field with the curves and fixed edges surrounding it.

Time to transition into the transitions. 📐

⚒️ Filling in the FieldContinued installation of the bluestone field, working outward from the established center layout...
08/18/2026

⚒️ Filling in the Field

Continued installation of the bluestone field, working outward from the established center layout. Individual stones were fitted and trimmed as needed to maintain joint spacing, alignment, elevation, and overall pitch. Natural variations in stone size and thickness required adjustments throughout the field as the layout was permanently set.

Type S mortar and thinset were used according to the required setting depth. A substantial additional section has now been permanently set and is tying together cleanly with the previously completed work. Joints were cleaned and prepared for final pointing, stone surfaces were sponged clean, and the work area was secured for curing. 🪨

⚒️ Setting the Spine ⚒️Today the bluestone terrace connection moved into permanent installation.Beginning with the origi...
08/17/2026

⚒️ Setting the Spine ⚒️

Today the bluestone terrace connection moved into permanent installation.

Beginning with the original 2’ × 2’ reference stone, the field progressed across the center while maintaining elevation, joint spacing, and the established pattern.

Because the existing concrete base and natural-cleft bluestone vary in elevation and thickness, both mortar and thinset were used according to available bedding depth.

The central spine is now permanently set from one side of the connection to the other, providing the reference for the remaining field. Joints were maintained at approximately 1/2”, with minor adjustments for the natural irregularity of the stone.

Another solid step forward. The pattern is now becoming part of the overall system. 🧩

⚒️ Field Layout CompleteToday’s bluestone installation progressed through the field layout phase. The remaining area was...
08/14/2026

⚒️ Field Layout Complete

Today’s bluestone installation progressed through the field layout phase. The remaining area was measured and squared, and a representative section of the existing patio was documented to establish the appropriate stone sizes, proportions, joint relationships, and overall pattern for the new work.

Bluestone was hand-selected at the quarry, transported to the site, and staged by size for efficient handling. The field was then dry-laid piece by piece, maintaining an axis complementary to the existing bluestone patio so the new connector carries the established orientation and visual language naturally through the space.

As the layout developed, individual pieces were repositioned and adjusted to resolve spacing while balancing stone sizes, joint relationships, color variation, and overall composition throughout the irregular field. Particular attention was given to distributing the natural range of blues, grays, greens, browns, and warmer tones throughout the installation rather than allowing similar material to become concentrated in any one area.

The field layout is now complete, establishing the finished pattern and providing a clear roadmap for final fabrication and installation. Remaining perimeter conditions will be resolved through custom cuts and available material as the stone is installed.

With quarry dust still present, much of the stone’s natural character remains subdued. A thorough cleaning and pressure washing will reveal the full range of color and variation throughout the field, which should become considerably more pronounced. I’m looking forward to seeing it all come to life as installation gets underway. 🪨

Address

Frenchtown, NJ
08825

Alerts

Be the first to know and let us send you an email when Hewitt Masonry LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Hewitt Masonry LLC:

Shortcuts

Share