Benchmark Trails LLC

Call Directions Website Contact the business

Benchmark Trails LLC Benchmark Trails LLC | Trail Design, Construction & Consulting | Sustainable Trails for All | PTBA Member Company

🌿 About Benchmark Trails LLC | Trail Design, Construction & Consulting 🚵‍♂️
At Benchmark Trails LLC, we believe great trails are more than just dirt paths—they are gateways to adventure, community connection, and sustainable outdoor recreation. Founded by Uriah Steber, a veteran of the 82nd Airborne Division and an experienced trail builder, Benchmark Trails brings precision, passion, and professionalism to every project.

🔹 What We Do
We specialize in designing, building, and maintaining high-quality, sustainable trails for:
✅ State & Municipal Parks & Recreation Departments – Enhancing public land access with expertly crafted trails.
✅ Tourism & Economic Development Organizations – Creating destination-worthy trails that drive outdoor tourism.
✅ Private Landowners & Developers – Custom trails for resorts, outdoor parks, and recreational properties. Our expertise includes:
🚵 Trail Planning & Consulting – Helping land managers design and execute long-term trail strategies.
🌲 Sustainable Trail Construction – Handbuilt & machine-built singletrack, flow trails, and multi-use paths.
🔧 Maintenance & Restoration – Keeping trails safe, durable, and enjoyable for years to come.

🌍 Our Mission
We are committed to building world-class trails that balance recreation with environmental responsibility, ensuring fun, flow, and function for riders, hikers, and outdoor enthusiasts.

📍 Where We Work
Based in Pierre, South Dakota, Benchmark Trails proudly serves the Midwest and beyond, working on projects of all sizes—from local trail systems to large-scale recreational developments.

📞 Let’s Build Something Amazing Together!
📞 Call/Text: 605-222-3260
📧 Email: [email protected]
🌐 Website: www.benchmark-trails.com

Follow us for updates on trail projects, behind-the-scenes insights, and outdoor inspiration! 🚴‍♂️💨

Looking to add a pumptrack but can’t get past the cost?Let’s bring those same elements to paths around town with Rad Rou...
10/15/2026

Looking to add a pumptrack but can’t get past the cost?

Let’s bring those same elements to paths around town with Rad Routes!

A short stretch of concrete rollers alongside an existing path gives riders a fun detour before connecting back to the main route. Start with one set and build from there!

Designed for installation by your local concrete contractor or city crew, with guidance from Benchmark Tracks.

We’re looking for pilot communities! Contact us to learn how your city could be one of the first.

A little more fun along the way.

Meet Rad Routes—three concrete rollers alongside an existing recreation path. Riders can take the rollers, then merge back onto the main path. The flat route stays open for everyone.

Benchmark Tracks is looking for pilot communities to help bring the first Rad Routes to life. Our system is designed for installation by city crews or local concrete contractors, with hands-on support from us.

Have a spot in mind? Special pilot pricing is available. Send us a message to learn how easily your city could be the first!

*Concept rendering shown.*

10/08/2026

Pretty cool to see something we’ve been working on getting put to use! 🤙

Our sister company, Benchmark Tracks, had prototype rollers out at Great Bear Ski Valley for the Falls Area Singletrack Enduro Race and Take a Kid Mountain Biking Day. Watching kids try them out and come back for another lap is what this is all about.

Big thanks to for getting the rollers set up and for capturing the fun!

Always a good time connecting with fellow trail builders!This year, you’ll find us exhibiting as Benchmark Tracks LLC. W...
09/21/2026

Always a good time connecting with fellow trail builders!

This year, you’ll find us exhibiting as Benchmark Tracks LLC. We’ll be showing off our new concrete pump track system and looking to meet companies interested in adding pump tracks to what they offer through a faster, repeatable installation system designed to preserve the intended geometry from one build to the next.

I’m also excited to be back in North Carolina. Seemingly in another life, I lived there—Fort Bragg, anyway. I’m looking forward to getting back and seeing it through a whole new set of eyes!

See you at the Summit!

🎉 Registration is officially OPEN for the 2027 International Trails Summit!

Join American Trails and Professional Trailbuilders Association April 13–15, 2027 in Durham, North Carolina, for three days bringing together the trail community from across the country and around the world.

We’re expecting 850+ attendees and 60+ exhibitors from the public, private, and nonprofit sectors, with sessions, networking, and a half-day offsite experience.

🐦 Planning to join us? Early bird registration is your best deal — register by December 1 to save. Members must contact American Trails for the discount code.

Field trips, technical trainings, and other pre- and post-Summit opportunities will open for registration later this year.

Durham, here we come!

Learn more and register: https://buff.ly/ycKYLJN

08/28/2026

5 miles of handbuilt love for your enjoyment 🤙

Lake Oahe - South Dakota

Thanks to Travel South Dakota, Canyon & Mike for sharing the raddest lil spot on the prairie!

07/16/2026

If you haven’t been yet be sure and get out to shred JDs Way and more of our work at Great Bear Ski Valley in Sioux Falls, South Dakota 🤙

06/11/2026
What if South Dakota's next great destination wasn't a building, attraction, or event...What if it was a trail?A trail t...
06/10/2026

What if South Dakota's next great destination wasn't a building, attraction, or event...

What if it was a trail?

A trail that follows the Missouri River from Fort Pierre to Oacoma. Connecting public lands, Tribal communities, small towns, campgrounds, wildlife areas, and some of the most spectacular scenery in the Great Plains.

The BOLT Coalition—led by Bikepacking Roots, IMBA, PeopleForBikes, and partners across the country—released Long Live Long Trails, a report highlighting existing and potential long-distance trail opportunities on America's public lands.

Reading through it, it's hard not to imagine what could be possible along the Missouri River.

The Missouri River Trail is still just a vision, but every great trail starts somewhere.

Check out the Missouri River Trail Report: https://bit.ly/ISG-MRLDT-Report

06/02/2026

Huge thanks to Kasey & RasDak for being such amazing supporters of cycling both on the road and off!

05/31/2026

Great to see the Aberdeen Bike Park Project getting attention!

Benchmark Trails was fortunate to help the Leadership Aberdeen class early on with bike park concepts and guidance as they worked to bring this vision to life. It’s exciting to see local partners, engineers, and community leaders rally around a project that can create more outdoor recreation opportunities for Aberdeen.

The project is now working toward funding for a future concrete pump track, where Benchmark Tracks is focused on bringing communities a real, durable, 8-foot-wide precast concrete pump track system built for quality, consistency, and northern climates.

Proud to have played a small part in helping move this idea forward.

05/21/2026

The South Dakota Department of Transportation (SDDOT), in cooperation with the Federal Highway Administration (FHWA), is seeking public comment on a proposed Section 4(f) de minimis impact determination related to the temporary closure of a segment of the Racetrack Trail in Meade County. The temporary trail closure is associated with planned improvements to Interstate 90 from exit 32 to west of exit 37. Construction activities include pavement replacement, drainage structure improvements, and reconstruction of the exit 34 interchange.

The affected trail segment extends from the Rapid City, Pierre, & Eastern Railroad crossing to its connection with the Centennial Trail. The closure is expected to last approximately one year, after which the trail will be restored to its original condition. The temporary closure will not adversely affect the activities, features or attributes that qualify Racetrack Trail for protection under Section 4(f).

FHWA intends to make a Section 4(f) de minimis impact determination based on coordination with the BLM and the limited duration and nature of the closure.

The public is invited to review and comment on the proposed impact determination at www.i90exit32to40project.com.

Written comments may also be submitted to Andrea Bierle, SDDOT Environmental Engineer, by mail at 700 E. Broadway Ave., Pierre, SD 57501 or via email to [email protected]. For further information, please call 605-773-3180.

The public comment period is open through Friday, June 12, 2026.

For the latest on road and weather conditions, road closures, construction work zones, commercial vehicle restrictions, and traffic incidents, please visit https://sd511.org or dial 511.

Address

Fort Pierre, SD

Alerts

Be the first to know and let us send you an email when Benchmark Trails LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Benchmark Trails LLC:

Shortcuts

Share

Category