03/19/2025
Completed paving the Hayden Blvd extension road past Menards.
Laurita Excavating performed the site prep and utilities.
Asphalt from Greer Asphalt.
Naturally, we completed the asphalt install.
4.5” base 1 asphalt.
2.5” base 2 asphalt.
1.5” wearing course.
Additionally, we had to tack the face of the concrete gutter and curb to help seal against water pe*******on.
Thanks to CK Services for applying road markings and thermo plastic.
Thanks to Chip Pletcher and Cat Rentals for getting us the proper compaction equipment on time.