PercPro FL LLC

PercPro FL LLC PercPro FL LLC is here to serve your permitting and septic design needs in Southwest Florida.

Another PINE ISLAND install last week.
09/27/2025

Another PINE ISLAND install last week.

05/26/2024

Looking for a crew cab service body 2500 or F250 Diesel 4x4. Anyone have one they want to roll out of their fleet? Preferable 2014 or newer.

Setting a septic tank in NW Cape Coral FL. Great weather here for it. Really heating up. Glad I have AC in my cab.
05/06/2024

Setting a septic tank in NW Cape Coral FL. Great weather here for it. Really heating up. Glad I have AC in my cab.

This site had a 60" excavation to dig out soft rock. See the white layer behind the skid steer. That natural fine sand b...
05/05/2024

This site had a 60" excavation to dig out soft rock. See the white layer behind the skid steer. That natural fine sand below was the orange color. We back filled with perc sand in the drain field. Some of our installs in SWFL require excavations like this.

Jessie cleaning off a tank lid during our install in NE Cape Coral FL today. We do septic designs, permitting and instal...
05/03/2024

Jessie cleaning off a tank lid during our install in NE Cape Coral FL today. We do septic designs, permitting and installs in SWFL. Let us know if you need a hand with a project.

04/09/2024

Getting started on a lot.
We typically can turn in a site plan to the county within 2 week.
+1 (239) 313-8171
[email protected]

Jessie found this gopher tortoise on one of our sites. While doing site evaluations, if we come across,  gopher tortoise...
04/08/2024

Jessie found this gopher tortoise on one of our sites. While doing site evaluations, if we come across, gopher tortoises or scrub Jays or bald eagles, we will let you know. We typically can turn in a site plan to the county within 2 week.
+1 (239) 313-8171 OR 501-291-2515
[email protected] [email protected]

04/08/2024

Finding an existing septic system drain field.
We typically can turn in a site plan to the county within 2 week.
+1 (239) 313-8171
[email protected]

04/08/2024

How do we determine the elevation of your drainfield in Southwest Florida? We determine by defining the wet, seasonal water table and then setting the bottom of the drainfield 24 inches above that typically.
We typically can turn in a site plan to the county within 2 week.
+1 (239) 313-8171
[email protected]

04/07/2024

Jessie walking us through a septic a system awaiting final cover.
We typically schedule your install 2 weeks from your call.
239-313-8171 OR 501-291-2515
[email protected] [email protected]

04/07/2024
Jessie is Rocking some Friday VIBES in LEHIGH ACRES today. We typically can turn in a site plan to the county within 2 w...
04/05/2024

Jessie is Rocking some Friday VIBES in LEHIGH ACRES today. We typically can turn in a site plan to the county within 2 week.
+1 (239) 313-8171 OR 501-291-2515
[email protected] [email protected]

Address

PO Box 292
Estero, FL
33929

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Alerts

Be the first to know and let us send you an email when PercPro FL LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share