10/12/2026
Catching you up on the fire rebuild.
The last two or three weeks haven't been on video much. I've been buried in site prep for a few big jobs coming up: estimating, contracts, permitting, grades and elevations. Meanwhile the crew has been doing outstanding work out here.
The wall behind me looks back into the arena. It gets a 2x6 wall, insulated, to separate what will be an ADU from the barn side, and it has to meet fire code. The tack room below was lost in the fire.
Next goal: roof on, paper on, metal on. Get it dry so we can build out the inside right for our customer.