Fortis Siteworks

Directions Website Contact the business

Fortis Siteworks Fortis Siteworks delivers underground utilities, site development, horizontal boring, and earthwork.

Our crews build the infrastructure behind residential communities, commercial developments, industrial facilities, and municipal projects.

Keeping a clean house. 👏Joe spent countless hours organizing equipment, materials, and workspaces at our Fortis headquar...
10/13/2026

Keeping a clean house.

👏Joe spent countless hours organizing equipment, materials, and workspaces at our Fortis headquarters.

The work may not be glamorous, but the pride behind it shows. Thanks Joe!

10/12/2026

That orange fence means “do not disturb.”

Kevin explains the role tree protection fencing and silt fence play in protecting sensitive areas and helping control sediment during construction.

10/09/2026

Fortis in the Field | Harbor Pointe

We're taking a look at the erosion and sediment control measures being implemented at Harbor Pointe as site development continues.
Kevin discusses how diversion ditches, a temporary sediment pond, stabilization efforts, and rip rap work together to support stormwater management throughout the construction process.

With rainfall in the forecast, it's a good opportunity to highlight some of the planning and infrastructure that help manage runoff and control sediment on an active construction site.

Responsible site development requires more than moving dirt.

It takes planning, preparation, and attention to detail every step of the way.

10/08/2026

A blocked stormwater crossing 🤔

A newly rebuilt highway.

A better solution than tearing up the road.

Fortis Siteworks supported E.R. Snell Contractor, Inc. on a trenchless casing installation beneath US 441, restoring drainage performance while keeping the roadway intact.

UndergroundUtilities

Nearly Three Miles of Force Main The Fortis Siteworks utility team is making progress on a force-main installation stret...
10/02/2026

Nearly Three Miles of Force Main

The Fortis Siteworks utility team is making progress on a force-main installation stretching nearly three miles near Greensboro.

A force main is a pressurized sewer pipe that moves wastewater when gravity alone cannot. Along the way, crews are also completing underground crossings, installing valves and testing points, connecting to the existing system and restoring the corridor behind them.

A project of this length takes the right people, equipment and wet-utility experience to keep moving.

10/01/2026

Building Up The Veazey Pump Station

Backfilling and grading are nearing completion at the Veazey pump station site near Lake Oconee.

Fortis is hauling, placing, and compacting 25,000 cubic yards of fill to bring the site up to its planned elevation.

This progress update shows how our grading and wet utility capabilities come together on the larger Richland Connector project.

Fortis Delivers Sitework at ScaleStillwater is close to home, but the size and scope of the job show what the Fortis tea...
09/28/2026

Fortis Delivers Sitework at Scale

Stillwater is close to home, but the size and scope of the job show what the Fortis team can deliver across Georgia.

Our people moved the dirt, built the roads and installed the water, storm drainage and sewer systems serving the community.

Good to spend time with and and recognize the work that went into getting Stillwater at Lake Oconee to this point.

09/25/2026

Fortis in the Field 🎥

We’re kicking off a new series with an update from Highway 44 at Lake Country Village, where Fortis delivered the sitework and underground infrastructure for the new Publix-anchored development in Putnam County.

Boring in Coastal Georgia… 🎯The Fortis boring team installed a 240-foot run of 54-inch steel casing along Blue Jay Road ...
09/23/2026

Boring in Coastal Georgia… 🎯

The Fortis boring team installed a 240-foot run of 54-inch steel casing along Blue Jay Road in Rincon, finishing within the thickness of a 💳 from the intended target.

Using our Barbco Inc auger boring machine, the team completed the underground crossing without opening the roadway above. That kind of accuracy takes careful planning, specialized equipment and an experienced crew working together.

Another example of the precision and trenchless capability the Fortis Siteworks boring team brings to projects across Georgia.

Ten Feet Across. Twenty-Six Feet Deep.Most people never see the equipment that keeps wastewater moving.This large fiberg...
09/18/2026

Ten Feet Across. Twenty-Six Feet Deep.

Most people never see the equipment that keeps wastewater moving.

This large fiberglass structure is called a wet well. Once installed 26 feet below ground, it will collect wastewater before pumps move it through pressurized pipes toward a treatment facility. The wet well is a central part of a pump station, which keeps wastewater moving when gravity alone cannot do the job.

Shout out to members of the Fortis utility team helping bring the system together!

Address

174 Sammons Industrial
Eatonton, GA
31024

Alerts

Be the first to know and let us send you an email when Fortis Siteworks posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fortis Siteworks:

Shortcuts

Share