12/06/2025
As I reflect on my journey, I am reminded that perseverance and passion are the cornerstones of achieving greatness. Building meaningful relationships with clients is also vital, and I am honored to have forged a lasting bond with Jonathan, who has become not only a client but also a friend. We have uplifted each other in our respective endeavors, and it has been incredibly fulfilling to witness his growth. This project holds great significance for me, as it involves a client who has become a close friend. Initially, I was approached about installing a whirlpool bath on a deck. Recognizing the importance of safety and durability, I opted to construct a sturdy platform to support the whirlpool bath, rather than simply framing it out. This decision was influenced by the fact that the property is listed on Airbnb, and the goal is to create a unique experience that guests will cherish and recommend to others. The project began with the demolition of the existing 6x10 deck, which was replaced with a more spacious 10x18 deck. The new deck features a 2x12 outer box and 2x10 joists, ensuring exceptional stability and weight capacity. To bring the deck up to code, we installed new Sona tubes and anchored the joists to the house. Additionally, flashing was added to prevent water damage, as this is often a concern with homes in the Saw Creek area. Once the deck was complete, we shifted our focus to the whirlpool bath platform. We poured 12-inch Sona tubes for the footings and connected them to rebar for added stability. The platform itself was constructed using 6x6s on top of joist brackets, ensuring a secure and rot-resistant foundation. The wood was then wrapped with flashing and ice and water shield for extra protection. A roof was built using 2x6s and 12-foot metal panels, providing a sturdy and weather-tight structure. Finally, the whirlpool bath was carefully inserted into the platform, leaving a half-inch lip around the edges. The deck boards were then removed, cut to fit around the whirlpool bath, and reinstalled. The railings were set at 42 inches, slightly higher than standard, and metal wire was run throughout the railing system for a sleek and polished finish. This project was completed in approximately nine days. For a free estimate, please contact me at 570-202-0649. I would like to extend my heartfelt gratitude to Jonathan and Christina for their continued business and support over the years.