John C Digertt

John C Digertt Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from John C Digertt, Heating, ventilating & air conditioning service, 9 commerce Circle, Durham, CT.

Delivery of three 30,000 gallon highland tank bellow ground stroesge tanks for the Yale sterling power plant upgrade pro...
06/13/2024

Delivery of three 30,000 gallon highland tank bellow ground stroesge tanks for the Yale sterling power plant upgrade project, this project includes replacement of bulk storage tanks, piping and pump sets supplied by John C Digett inc.

Newly installed fuel supply system for two new life safety generators 14 stories up in the   this project consisted of t...
04/28/2023

Newly installed fuel supply system for two new life safety generators 14 stories up in the this project consisted of two 2,500 gallon double wall main tanks, two double wall day tanks and four water proof fuel oil pump sets.

Diesel life safety systems are vital part of any new building. John C Digett Inc specalizes in fuel oil pump sets, day t...
04/27/2023

Diesel life safety systems are vital part of any new building. John C Digett Inc specalizes in fuel oil pump sets, day tanks, filter sets, storage tanks and accessories to ensure any and all critical fuel system in your new or existing building is functioning peropely.

Recent Perma pipe installation at North Easten Univeristy of some low temperature hot water supply and return lines conn...
04/27/2023

Recent Perma pipe installation at North Easten Univeristy of some low temperature hot water supply and return lines connecting two new buildings. Mechanical work preformed by Cannistrsro Mechanicla

Before new construction of the AI institute at MIT en existing failed concrete steam vault needed to be re located and r...
04/27/2023

Before new construction of the AI institute at MIT en existing failed concrete steam vault needed to be re located and replaced. A new Perma Pipe prefabricated steam vault was used to compete the project. Beacon piping preform the installation of the new vault and tie in work into the existing steam & condensate lines

Branch connections needed to be made on the chilled water loop at Brown university in providence RI, this loop supplied ...
04/27/2023

Branch connections needed to be made on the chilled water loop at Brown university in providence RI, this loop supplied manny other buildings and could not be stoped to make a connection. John C Digertt INC preformed along side Arden Mechancial a pair of 6” size on size live taps using Vexve brand welded ball valves.

Our Lady Of Fatima Hopspital installed a new life safety generator system, this also meant a new fuel oil supply system ...
04/27/2023

Our Lady Of Fatima Hopspital installed a new life safety generator system, this also meant a new fuel oil supply system needed to be installed as well. John C Digett inc supplied Preferred Utilities Manufacturing Corporation pump set and controls along with PERMA-PIPE double wall piping and a new Highland double wall storage tank.

Pipeline flushing is a critical part of any new installation, removal of weld slag, construction debris and mill scale p...
04/27/2023

Pipeline flushing is a critical part of any new installation, removal of weld slag, construction debris and mill scale prior to system start up ensures that any heat exchangers or pumps in the pipeline will not be damaged or clogged. John C Digertt Inc preformed a high velocity and chemical flush on a newly installed district heating system at Colby College in Waterville ME mechancial work on this project was predicted by Johnson & Jordan, Inc

Bristol community college in Fall River Massachusetts was chosen as one of the DCAMM infrastructure upgrade sites. Durin...
04/27/2023

Bristol community college in Fall River Massachusetts was chosen as one of the DCAMM infrastructure upgrade sites. During this project,11 existing failed concrete steam and condensate manholes needed to be replaced along with thousands of feet of direct buried piping. John C. Digertt Inc worked with RW Sullivan engineering and PERMA-PIPE to supply all new vaults and piping on this project. Project GC was Gilbane, Inc. Excavation contractor BOND Brothers, Inc. And Mechanicla was preformed by Arden Mechancial.

Hartford Connecticut district energy distribution System supplies hot water and chilled water to numerous buildings. Dur...
04/27/2023

Hartford Connecticut district energy distribution System supplies hot water and chilled water to numerous buildings. During the last phase of expansion in 2018 John C Digertt INC supplied PERMA-PIPE supply and rerun piping and Vexve direct buried valves to complete this project.

Westfield State university was also selected to be part of the DCAMM infrastructure upgrades. This project was completel...
04/27/2023

Westfield State university was also selected to be part of the DCAMM infrastructure upgrades. This project was completeled in two phases and consisted of replacement of 12 concrete vaults and aproxemeyly 8,000’ of steam and condensate piping. John C Digertt INC supplied PERMA-PIPE direct burried piping and vaults on this project.

An entire concrete valve vault was eleminated on a chilled water piping project at the University of Massachusetts Amher...
04/27/2023

An entire concrete valve vault was eleminated on a chilled water piping project at the University of Massachusetts Amherst by using a pair of Vexve 20” pre insulated direct buried ball valves.

Address

9 Commerce Circle
Durham, CT
06422

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+18603490468

Alerts

Be the first to know and let us send you an email when John C Digertt posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share