08/21/2026
Upgraded a 200 amp service in a 2 family today to a 400Amp with a house panel and meter. This was required to handle the extra load of heat pumps, we also made sure all common area circuits were on the house panel. Big thanks to my brother for lending us another set of hands on this job.
**House panel is temporarily fed off one of the panels till National Grid installs the 3rd meter.
**Waiting on some custom labels to come in so we can properly label the meter socket