08/29/2026
Projects this week. Replaced 40 gal tank water heater with navian tankless in WDSM and Installed sump pit/pump and backwater valve with new floor drain on south east side of DSM. Got the outside drain tile tied to sump pit instead of dumping down floor drain. Old floor drain was broken in floor which made it a muddy mess and the sump ran non stop after we got it hooked up. They really needed one. All done under Des Moines ppp program and they only had to pay $300 out of pocket for all of it. For the haters, they passed inspections with flying colors.