Once framing is complete, the next step is to ensure the entire basement is properly planned and prepped for what comes next.
We go through the space and mark out the future locations for cabinets, dishwashers, refrigerators, and any other appliances or features the homeowner wants included.
We also identify what type of flooring will be installed in each area, whether that’s LVP, carpet, or gym flooring.
When LVP is being installed, floor prep is especially important. We grind down the concrete, apply primer, and pour self leveling material where needed to create a smooth, level surface before the flooring goes in.
A lot of the work that makes a project run smoothly happens long before the finished materials are installed. Planning and prepping everything early helps us avoid problems later and keeps the entire build moving in the right direction.