This Project Included A Full Driveway Replacement, Steps, And Some Added Curb & Gutter For 18” Of Extra Parking Length
We Placed Nearly 4 Yards Of Fiber-Mesh Reinforced Concrete On Top Of An Existing Wall Making A 24” Curb And Gutter
The New Curb & Gutter Was Tied Into The Driveway With Epoxy-Coated Rebar, Creating One Solid Installation
We Reversed Formed Two Steps Into The Driveway Because Of The Elevation Change
The Driveway Was Then Poured 6 Inches Thick With Fiber Mesh Reinforcement For Added Strength And Durability
It Took Some Planning And A Little Strategy To Make Everything Come Together