06/04/2026
Massive transit infrastructure projects demand absolute precision and zero installation delays.
The Fort Lauderdale Airport Terminal 1 required a secure facade capable of managing strict logistical constraints. We delivered a solution that minimized disruptions in a highly active environment.
▪️ Fort Lauderdale Airport Terminal 1
▪️ Pre-fabricated unitized curtain wall
▪️ Complete turnkey installation
Moving the assembly steps into a controlled factory environment speeds up the onsite installation process. This approach allows critical airport operations to continue safely while we secure the building envelope.
Efficiency is engineered into the system.
To learn more about aviation projects visit www.crawfordtracey.com