08/03/2026
Before, during, and after of a new service replacement. As of January 2026 we need to install meter mains with all new services and upgrades. They’re larger and a bit more involved (we need to make sure grounds and neutrals are separated in the panel when we do this and replace the large cable between the two) but we get them done and they’re ultimately for safety in the event a firefighter needs to turn off power during an emergency