Chesak Carpentry

Chesak Carpentry Quality Home Improvement

This was the whole kitchen remodel. We had a lot going on here. Removed the lowered kitchen ceiling / soffit to open eve...
12/27/2025

This was the whole kitchen remodel. We had a lot going on here. Removed the lowered kitchen ceiling / soffit to open everything up and added all new cabinets floors, wood ceiling, granite counters all new lighting. This was a pretty big change.

some pics of some custom details we did and some of the finished rooms. Some before pics thrown in as well.
11/29/2025

some pics of some custom details we did and some of the finished rooms. Some before pics thrown in as well.

This was the master bath remodel where we removed an old tub and mirrors ( yes floor to ceiling mirrors and carpet aroun...
11/28/2025

This was the master bath remodel where we removed an old tub and mirrors ( yes floor to ceiling mirrors and carpet around the black tub.) I have no words for the 70 / 80's style but wowza!
Then we updated with walk-in shower and even put in washer /dryer combo in the bathroom.

This is some of the new doors, windows and fixing up the outside of our house remodel.
11/27/2025

This is some of the new doors, windows and fixing up the outside of our house remodel.

This is some of the basement remodel of new bathroom, laundry room and living area with ship lap wall at the end.
11/23/2025

This is some of the basement remodel of new bathroom, laundry room and living area with ship lap wall at the end.

Some new stairs and railing during our remodel.
11/22/2025

Some new stairs and railing during our remodel.

Haven't posted in a long time but we have been busy remodeling a house. Here is one of the bathrooms that we completed.
11/21/2025

Haven't posted in a long time but we have been busy remodeling a house. Here is one of the bathrooms that we completed.

Framing in some basement walls.
12/21/2024

Framing in some basement walls.

Remove old white columns and added some nice cedar post!
12/15/2024

Remove old white columns and added some nice cedar post!

Made an access panel to cover electrical panel, and added 2 gates to front and back decks for this customer.
12/14/2024

Made an access panel to cover electrical panel, and added 2 gates to front and back decks for this customer.

Bathroom update! Removed tub and replaced with walk-in shower with grab bars and seat. Painted bathroom, new toilet and ...
12/07/2024

Bathroom update! Removed tub and replaced with walk-in shower with grab bars and seat. Painted bathroom, new toilet and added washer and dryer hook up in closet behind bathroom.

Address

Davis, IL
61019

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+18159882027

Website

Alerts

Be the first to know and let us send you an email when Chesak Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category