From site prep to slab pour — foundation work in progress.

At DSK Construction, we support builders with dependable Shell and Equipment services, delivering safe, organized, and high-quality results at every stage of construction.

DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449

Frame it. Hang it. Finish it. Repeat. Happy Friday! DSK CONSTRUCTION CORPEquipment | shell | drywall CGC 1539151954.651....
02/27/2026

Frame it. Hang it. Finish it. Repeat. Happy Friday!

DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449

Another day. Another roof set. On to the next (hopefully not in Miami Beach 😅) DSK CONSTRUCTION CORPEquipment | shell | ...
02/24/2026

Another day. Another roof set. On to the next (hopefully not in Miami Beach 😅)

DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449

Our team executed this foundation and slab on grade with detailed formwork, reinforced steel placement, and precision co...
02/23/2026

Our team executed this foundation and slab on grade with detailed formwork, reinforced steel placement, and precision concrete pumping to ensure structural integrity from the ground up.

From equipment coordination to final surface finishing, every phase was handled with accuracy, safety, and efficiency to support the builder’s schedule.

DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449

Drywall work in progress at this garage project in Davie.Progress like this is where quality truly begins.DSK CONSTRUCTI...
02/12/2026

Drywall work in progress at this garage project in Davie.

Progress like this is where quality truly begins.

DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449

This was part of the construction process for a guest house in Delray Beach, where our Drywall Division supported the bu...
02/10/2026

This was part of the construction process for a guest house in Delray Beach, where our Drywall Division supported the build with precise interior work.

From framing and insulation to drywall installation and finishing, our team focused on accuracy, coordination, and clean ex*****on at this stage of the project.

DSK CONSTRUCTION CORP
Equipment | Shell | Drywall
CGC 1539151
954.651.0449

We’re officially doing our own steel fabrication in-house. From the initial shop drawings to the final install, DSK CONS...
02/10/2026

We’re officially doing our own steel fabrication in-house. From the initial shop drawings to the final install, DSK CONSTRUCTION is your one-stop shop for structural excellence. Let’s build something solid together.

DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449

152 cubic yards of concrete & 21,000 lbs of rebar later the grade beams / structural slab combo are poured and done. The...
02/03/2026

152 cubic yards of concrete & 21,000 lbs of rebar later the grade beams / structural slab combo are poured and done. The job is now ready for our friends precast walls and floors. We’ll be back to fly trusses and start helical piles for site wall in a few weeks.

DSK CONSTRUCTION CORP
Equipment | shell | drywall
CGC 1539151
954.651.0449

Davie project progress.Selective demolition, structural shoring, and foundation work underway, each step carefully execu...
01/27/2026

Davie project progress.
Selective demolition, structural shoring, and foundation work underway, each step carefully executed to prepare for the next phase. 🚀🚀🚀🚀

Another phase completed ✔️Exterior work wrapped up and ready for the next step.Equipment | Shell | DrywallCGC 1539151
01/22/2026

Another phase completed ✔️

Exterior work wrapped up and ready for the next step.

Equipment | Shell | Drywall
CGC 1539151

Most people think concrete is the job.It’s not.What actually matters happens before the pour:the prep, the reinforcement...
01/08/2026

Most people think concrete is the job.
It’s not.

What actually matters happens before the pour:
the prep, the reinforcement, the alignment, and the planning that no one sees once it’s finished.

At DSK Construction, we focus on what holds everything together — not just what looks good at the end.

💬 This step is the difference between lasting and failing.

📩 DM us to build it right from the ground up

Address

7020 Sw 22nd Court Unit C&d
Davie, FL
33314

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+19546510449

Alerts

Be the first to know and let us send you an email when DSK construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share