08/13/2026
Prep work complete. Next stop: ASPHALT. 🔥
We stripped the topsoil, installed ¾” crusher run, graded everything out, and put the roller to work getting this base properly compacted.
You can already see the transformation, and this is all before a single ton of asphalt hits the ground.
A good asphalt job is only as strong as the base underneath it. We’ll be back later this week to pave it out! 🚧
Alabama Asphalt Repair, Inc.