06/27/2025
Here’s an update on the construction progress of the new home on a 1-acre lot in Crystal Manor. So far, we have completed land clearing, grading, and preparation of the house pad. The upcoming steps include:
1. **Trades Grade**: Clean up after the block and concrete work.
2. **Rough Grade**: Establish proper drainage.
3. **Driveway Grading**: Form the driveway and walkways for concrete.
4. **Final Grading**: Prepare the area for sod installation.
Get in touch with TDM Solutions for your upcoming land improvement project.