08/17/2026
Upland Design Group is proud to share the completion of the Cumberland County Historic Courthouse renovation. Built in 1905 and expanded in the 1970s, this building remains the heart of county government, housing the county mayor, register of deeds, veterans services, finance, and human resources offices.
The historic Large Courtroom now serves as the county commission chamber. Above it, three oak trusses supporting the clock tower cupola required significant structural repair. The structure is celebrated and represented through drywall soffits shaping the new ceiling design. At the back of the chamber, the original window openings, once an exterior wall before the 1970s addition, now hold display cases showcasing historic artifacts from Cumberland County's past. In the corridors, plaster was removed throughout to reveal the repaired and sealed structural brick walls beneath. The rough, weathered texture stands in contrast to the new drywall, creating a clear delineation between the new and old methods of construction.
Thank you to Stubbs Construction Services LLC who served as the general contractor for the renovation phase of the project, as well as Wiss, Janney, Elstner Associates - WJE and Buckeye Construction & Restoration for their work on the structural repair and historic preservation of the building envelope. And finally, thank you to Cumberland County, TN for trusting us with a project so important to the local community. It has been an honor to help preserve this landmark for generations to come.