08/30/2026
I’ve been working on a 1500 foot long driveway from bare-bones to almost complete 65 loads of material three loads of number one stone so far 2 Culvert pipes , 42 loads for the approach alone to the road because it dropped off so far and I believe it’s turning out really nice