10/09/2026
Working on a tight timeline!
After several days of hard work and preparation, we were finally ready to pour half of the footings for this large, two-story home! It took three concrete trucks to get the job done. Since we couldn’t get the trucks close enough to the footings, we put one of our skid steers to work, moving the concrete where it needed to go.
Rain destroys footings if they are not poured ahead of it. The footings needed to be inspected and poured before the hurricane moved in, so we worked hard to stay on schedule and get the concrete placed before the hurricane.
I love it when a plane comes together!