06/19/2026
A little service call for UT Marine Science Institute. Reworked the High Eave trim on this lab bldg. There were no closures to seal the existing eave trim allowing water to blow in with all this wind driven rain we’ve been having. Installed metal closures and new eave trim to match the rake trim, sealing the area from any future water intrusion. Lab is back up and running. We are in Hurricane Season, if you need your building inspected, give us a call!