08/24/2026
Before and after. All new flooring on first level. All new baseboards throughout first and second floor. Original door casings with bonding primer and white cabinet paint to match baseboards. Deleted a few information outlets on media wall. Fixed ceiling patch correctly and painted entire ceiling. Fixed a broken towel rack.