07/31/2026
This popcorn-ceiling reconstruction was completed in one day through MakeReady Masters’ active Lowcountry operation. We’re presenting it on our Columbia platform intentionally:
The location changes. The operating standard does not.
The scope included:
• Substantial open ceiling damage
• New drywall installation
• Complete finish preparation
• Existing popcorn texture matched
• ProMar 200 finish coat
• Final QC and rent-ready completion
This is the same operating model MakeReady Masters is carrying into Columbia and the Midlands: absorb unexpected scope, control the materials, complete the entire finish, document the result, and protect the turnover board.
Regional scale is not a pin on a map. It is proven ex*****on that can be repeated across markets.
One day. One accountable contractor. Documented completion.
MakeReady Masters
Columbia & Midlands Apartment Turn Operations
makereadymasters.net