Global Underground Corp

Directions Website Contact the business

Global Underground Corp Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Global Underground Corp, Construction Company, 641 Winters Drive, Colorado Springs, CO.

Global Underground Corporation has been recognized as a industry leader in underground utility construction for over twenty years specializing in trenchless technology and conventional open cut excavation.

Job Well Done!As the Denver Metro area expands rapidly, new infrastructure is essential to support future residential an...
10/02/2026

Job Well Done!

As the Denver Metro area expands rapidly, new infrastructure is essential to support future residential and commercial developments. Global Underground was selected to install a new 24” water line connecting an existing water main to a new development, utilizing our expertise in trenchless design, engineering, construction, and large-diameter FPVC pipeline installation. Global Underground completed two highly technical trenchless crossings. The 1st consisted of a 485’ bore installing 36” steel casing beneath a highway and major railroad. The 2nd crossing presented a unique opportunity for us to work closely with our engineering team to change the design of the bore to not only cross the railroad but to additionally cross a wetland area in one bore to eliminate disturbances to the native land and avoid environment impacts. Due to soft soils this crossing utilized pipe-ramming methods to install 180’ of 48” steel conductor casing underneath the railroad. Then 600’ of 24” FPVC pipe was installed through the conductor casing and then using HDD methods underneath the wetlands to complete the bore. The project required close coordination between our Tunneling and HDD divisions to include design, site layout, construction setup, permitting, railroad flagging, scheduling, and project coordination. Through collaboration with the owner, owner’s representatives, general contractor and Global Underground teams, the project was successfully completed while meeting and exceeding project goals.

Job Well Done!   Our team is currently executing a highly complex horizontal directional drilling (HDD) scope in the hea...
05/01/2026

Job Well Done!

Our team is currently executing a highly complex horizontal directional drilling (HDD) scope in the heart of a city north of Denver, delivering two 20" chilled water bores crossing beneath a creek and extending south along a busy street. Each bore is installed at depths exceeding 75', with the majority of the alignment drilled through competent bedrock—presenting both technical and logistical challenges.
The scope requires both bores to begin on parallel alignments with approximately 10' of horizontal separation. As drilling progresses, the second bore transitions beneath the first, resulting in a stacked configuration on the exit side with five feet of vertical separation. This configuration will allow the construction of a single Controlled Restraint Assembly (CRA), optimizing the installation within an extremely constrained corridor.
The work zone is located within a high-traffic area serving pedestrians, cyclists, public transportation, and vehicular traffic. In addition, the bore path intersects numerous existing utilities, requiring extensive coordination with utility owners, inspectors, municipal agencies, and project stakeholders. This design-build effort for Global Underground has been successfully executed despite limited working room and dense existing infrastructure, underscoring our team’s ability to solve complex challenges through planning, collaboration, and disciplined ex*****on.
Most importantly, this work is being completed with a strong commitment to safety, professionalism, and minimal public disruption. We would like to recognize the field crew and support staff for their exceptional performance and patience while operating in such a tight and highly visible environment. Thank you to our employees for representing our company at the highest level.

04/30/2026

Happy Birthday Chance Guinn. We hope you have a wonderful day.

04/29/2026

Today is a big day for Anniversaries. Happy Anniversary to Jose Jimenez (7th), Jose Sanchez (7th), Jeremiah Torres (2nd), and Joaquin Diaz (1st).

04/29/2026

Happy Birthday Rafael Jimenez. We hope you have a great day.

04/28/2026

Happy Birthday Mr. Dan Hanson. We hope you have a fabulous day.

04/22/2026

Happy Birthday Cassi Calvillo. We hope you have a great day.

04/21/2026

Happy Birthday Ken Scharff. We hope you have a wonderful day.

04/19/2026

Happy Birthday Trista Kochis. We hope you have a great day.

04/15/2026

Happy 7th Anniversary Kevin Velarde

Address

641 Winters Drive
Colorado Springs, CO
80907

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Alerts

Be the first to know and let us send you an email when Global Underground Corp posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Global Underground Corp:

Shortcuts

Share