01/13/2023
High tides are coming Jan 20th-22nd. Below, is a link to a d**e and cofferdam installation work plan we implemented with the City of Bothell to construct an outfall system and tidal gate to the Sammamish River COB capital improvement project. Surface water drainage in low-level areas can be affected by tide levels and impede and back up causing flash flooding. Many options available including grants and other subsidies to help with permanent solutions.
Email Seth@pacificsitework for more information.