10/08/2026
What an honor to be at the Phase 1 Opening of the Park School’s Meyerhoff Theater last month!
The theater was built in the 1970s, and its utilitarian design, acoustics, functionality and safety standards were out of date. We helped the school elevate the design of the space, keeping the good and replacing what had to go. New carpeting, handrails, wall color, arm rests, and a custom CNC routed backlit wall panels that mimic the school’s logo were installed.
We’re looking forward to Phase 2, which will tackle house lighting, the AV system, curtains and more.
Founded in 1912, The Park School is such an important part of Baltimore’s history as the first private school in the city to accept students of all races, creeds and religions. We’re thrilled to be a part of their legacy, keeping their facilities safe, functional and enjoyable for generations of students to come.