05/28/2026
New Dock Build + Ramp Restoration
📍 Sandbar Road | Chapin, SC
Project Details:
• 4’ x 32’ stationary pier
• 12’ x 20’ floating dock
• New guide frames
• Black 3-chamber rub rail + corners
• Restored/redecked 4’ x 20’ ramp
Materials:
• #1 grade treated lumber framing
• MoistureShield Meridian composite decking — Catalina
• Color-matched composite screws
Built clean. Built strong. Built for life on the water.