Zuki Built

Zuki Built Construction you can count on.

Snowy week but we still accomplished some deck repairs. New stairs and a new deck stringer.
12/07/2025

Snowy week but we still accomplished some deck repairs. New stairs and a new deck stringer.

New threshold, door sill and toe kick replaced sealing this original solid wood door.
11/30/2025

New threshold, door sill and toe kick replaced sealing this original solid wood door.

New sink installed just in time for the holidays.
11/23/2025

New sink installed just in time for the holidays.

The unique vertical metal siding with a wood finish being installed on this garage addition presents a visually appealin...
11/15/2025

The unique vertical metal siding with a wood finish being installed on this garage addition presents a visually appealing combination of classic style and modern materials.

Helped another contractor find and repair a leaky basement. Under the front stoop was a huge hole in the poured concrete...
11/09/2025

Helped another contractor find and repair a leaky basement. Under the front stoop was a huge hole in the poured concrete foundation. We patched the hole, waterproofed the foundation and poured a new front stoop

Dismantling a failed 7' tall retaining wall and re-grading the hillside to enable safe operation of a zero-turn mower.
11/01/2025

Dismantling a failed 7' tall retaining wall and re-grading the hillside to enable safe operation of a zero-turn mower.

This home owner was tired of painting and wanted a low maintenance alternative. We used 3 layers of PVC trim around the ...
10/26/2025

This home owner was tired of painting and wanted a low maintenance alternative. We used 3 layers of PVC trim around the garage doors. The porch received PVC post wraps and new white vinyl railings.

This project's current state is somewhat unclear. However, we successfully rescued an old school that had been converted...
10/18/2025

This project's current state is somewhat unclear. However, we successfully rescued an old school that had been converted into a garage. The removal of crucial structural supports had put the building at risk of collapse, resulting in walls that were splayed outward and a roof that was sagging.

A 10'6" long bookshelf perfectly complements the space and stairs.
10/12/2025

A 10'6" long bookshelf perfectly complements the space and stairs.

This design element serves to dampen sound and provides a visual break in the unusually tall wall.
10/04/2025

This design element serves to dampen sound and provides a visual break in the unusually tall wall.

Stairs are coming along nicely.
09/20/2025

Stairs are coming along nicely.

Wrapping up the inside of the new house build. Cabinets, countertops, appliances, trim etc are all finished up.
08/23/2025

Wrapping up the inside of the new house build. Cabinets, countertops, appliances, trim etc are all finished up.

Address

Cedar Rapids, IA
52403

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

(319) 329-4297

Alerts

Be the first to know and let us send you an email when Zuki Built posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share