09/30/2026
The TxDOT Drainage & Pump Station posted earlier has generated immense interest, and rightly so. The scale of the project is massive showcasing incredible engineering innovation and top-tier skilled labor.
To highlight it's scale and the ongoing progress, I've shared additional content below captured on May 4, May 27 (🔥🔥🔥Video and 3D model virtual fly-through), and July 20, 2026.
Highlights:
🏗️Length: approximately 6.5 miles
🏗️Depth: 70 to 200 feet
🏗️Diameter: 22-foot diameter tunnels
🏗️Capacity to move 130,000 gallons per minute
SAK Construction Texas Department of Transportation Ferrovial