07/14/2026
400 feet of 200-amp electrical service with one enclosure pad and one transformer pad was successfully installed. The project passed both PEC inspections. Mule tape has been installed, and the setup is ready for PEC to pull the wire and set the transformer. The property was restored to its original condition after completion. Contact us for all your underground utilities needs.