08/19/2026
Framing is wrapped up on this one, and it’s always a good point in the build when you can finally start to see the house really take shape.
Next up are the rough-ins.
HVAC, electrical, and plumbing will all be moving through the house before we close everything in and move on to insulation and drywall.
A lot of the work that determines how a house functions long term happens during these next few stages, so there’s still a lot going on behind the scenes before we get to the pretty stuff.