06/15/2026
Leveling up ⬆️ and digging down ⬇️
The Cottonwood Connector Project is constructing new pipelines that, once interconnected, will strengthen regional water supply resilience while increasing the capacity and flexibility to transfer water supplies both in the near term and for future needs. The project consists of three interconnected pipeline segments designed to convey either raw or treated water in both northbound and southbound directions.
It's crazy to see the progress being made!