10/01/2024
Next: Cooper Black Building on East Main Street. Another extraordinary project by the Scully Partner Group. If you are in Bozeman - have a look front AND back. The Team has carefully braced the 1872 brick facade (with 84K pounds of concrete). It will be eventually reattached to a new 3 story mixed-use structure to be built behind it. Anticipated completion: Q4 2025