09/11/2026
As exterior construction and site improvements continue, the interior renovation is nearing completion at our City of Longmont, Colorado Government Safety & Justice Center project. The once dated and expansive entrance lobby has been re-configured and strengthened in its design and security while being refreshed and modernized.
The radial lobby with multiple points of check-in and direct access to the second-floor administrative offices has been consolidated. The ground floor addition coupled with an angular approach leads visitors to a single point of reception while securing access to the second floor.
The lobby finishes feature custom cut Armstrong World Industries acoustic paneling with aluminum reveals at the walls and a suspended acoustic ceiling held behind a bladed canopy with linear fixtures.
&company