04/29/2026
Rewind back to 2018: Foothills Bridge Co provided engineering support for the removal of the Old Sakonnet River Bridge in Tiverton, Rhode Island. Bridge removal included steel-beam approach spans, continuous-girder spans, and the main steel-truss arch structure across the Sakonnet River. Most of the bridge removal was performed using conventional methods, but the main-span arch-truss structure required special attention. The 680,000 lbs., 175' long center arch truss section was lowered using a jack-up tower system supported on barges and then floated out to be processed.
This challenging project serves as a great example of what can be accomplished through expert engineering, heavy lift systems, and seamless collaboration.
It was a pleasure working with and we would like to extend credit to Stephen SetteDucati for his spectacular photography.