CV Finish Carpentry and Remodel

CV Finish Carpentry and Remodel Your neighborhood finish carpenter. Care from first cut to final finish.

Had a few pipes to deal with here, and while I'm not an HVAC guy and can't make the pipework prettier, I did find a solu...
04/14/2026

Had a few pipes to deal with here, and while I'm not an HVAC guy and can't make the pipework prettier, I did find a solution for the numerous holes, swipe to see original floor tile before I capped the holes.

single wide trailer we remodeled for a ranch a few years back, condition was atrocious at the beginning. Have some befor...
03/09/2026

single wide trailer we remodeled for a ranch a few years back, condition was atrocious at the beginning. Have some before photos, was quite the transformation and the new ranch hands loved it and treated it well!
.

03/08/2026

Full remodel on this guest bath, new tub, tile, toilet, vanity, flooring, trim and drywall texture. Remounted the doors so that they actually close without a shoulder check.

If you suspect a leak in your window or door, it's better to deal with it sooner rather than later, even if that's just ...
02/27/2026

If you suspect a leak in your window or door, it's better to deal with it sooner rather than later, even if that's just re-sealing the exterior a little better. Swapped out quite a bit of subfloor this week. And if you need one swapped, give me a call, and we can see what we can do for you. Swipe to see the finished product.

Swipe to see the progression of this backsplash.
02/11/2026

Swipe to see the progression of this backsplash.

Friend got me all set up with some branded clothing so I can look good on the job. Thank you so much and can't wait to w...
02/08/2026

Friend got me all set up with some branded clothing so I can look good on the job. Thank you so much and can't wait to wear them on the job for the first time!

Tack room and lounge from a few years back working for my friend, we did the flooring, tongue and groove walls, trim, sa...
02/08/2026

Tack room and lounge from a few years back working for my friend, we did the flooring, tongue and groove walls, trim, saddle racks and bench to give the bare concrete and bare walls a little bit of character.

New member of the CV family of tools today, job trailer for tools and materials. Needs some benches and shelving built o...
02/06/2026

New member of the CV family of tools today, job trailer for tools and materials. Needs some benches and shelving built on the inside. But it turns out I know a guy who does carpentry.

When you don't have the luxury of installing flooring before door frames I like to grab a scrap piece or flipping a piec...
02/05/2026

When you don't have the luxury of installing flooring before door frames I like to grab a scrap piece or flipping a piece over to avoid scratching (my very first piece was through the closet door) and cut it flush with the multi tool and avoid any visible cut edges.

Progress on bathroom remodel with new tub and tile. New flooring, toilet, vanity to come.
02/03/2026

Progress on bathroom remodel with new tub and tile. New flooring, toilet, vanity to come.

Address

Boise, ID
83709

Opening Hours

Monday 7am - 5:30am
Tuesday 7am - 5:30am
Wednesday 7am - 5:30am
Thursday 7am - 5:30am
Friday 7am - 5:30am

Telephone

+12082703700

Alerts

Be the first to know and let us send you an email when CV Finish Carpentry and Remodel posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CV Finish Carpentry and Remodel:

Shortcuts

Share

Category