08/27/2026
Same building with the doors open.
One thing we do a little different is the same crew handles the concrete and the steel, and it comes on one invoice. Took us a while to get that set up right, but it saves people a lot of back and forth between two contractors.
If you've been thinking about one, no pressure from us. Most quotes go out the same day you text, they come in writing, and if it just sits in a drawer until March that's fine too. It's good for six months.
(205) 941-6115. Text your city and the size you've been kicking around, that's all we need.
Part one of this build is in the post below.