Bingham Development

Call Directions Website

Bingham Development Bingham Development is a full service residential & commercial general contractor serving Southeastern Michigan and Scottsdale Arizona

10/16/2026

Happy Friday from our Indian village project!

What a difference a few months can make!Our Lakehouse project has come a long way, and these before-and-after photos tel...
10/15/2026

What a difference a few months can make!

Our Lakehouse project has come a long way, and these before-and-after photos tell quite the story.

At Bingham Development, we believe a great custom home starts long before the finishes go in. Every step matters, and we’re excited to see this Lakehouse project continue to come to life!

Wondering what those wires are? That’s a low-voltage floor heating system, run through a special decoupling membrane on ...
10/12/2026

Wondering what those wires are? That’s a low-voltage floor heating system, run through a special decoupling membrane on top of the plywood subfloor. Once the tile is in, our electrician will finish installing the programmable thermostat so the homeowners can set the floor temperature and schedule when it comes on.
Nothing beats stepping onto a warm tile floor in the middle of a Michigan winter.

10/08/2026

There is a solid plan behind every successful lift! At the heart of every construction project there is a crane, and the process of raising a wall is no exception. But before the crane operator can even think about lifting that wall into place, there’s a lot of advanced planning that goes into it.

Seeing this wall lifted into the air, on our Chesterfield project, gives us a sense of just how massive this machine is, and it’s clear that without it, this critical stage of construction would be much more time consuming. With precision and care, the crane operator gently lowers the wall into its proper position, and the construction workers quickly secure it into place, making it a permanent part of the building’s frame. The video is a testament to the value of teamwork and the importance of having the right tools for the job.

10/08/2026

Our Wimbleton project is progressing nicely. The framework is complete, the windows are installed, and now it’s time to insulate the building. Things are on track and looking good.

10/07/2026

This is what the installation of the self leveling Lightcrete looks like. It comes out in a liquid form and is spread over the surface. As it cures, it self levels to create a perfectly level and hard surface.

10/06/2026

Things do change!

10/05/2026

Walls are getting primed and ready for finishing touches at our Middlebury project!

Address

401 S Old Woodward, Suite 470
Birmingham, MI
48009

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm

Telephone

+12485058811

Alerts

Be the first to know and let us send you an email when Bingham Development posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share