Fair Tide Marine & Construction llc

Call Directions Website Contact the business

Fair Tide Marine & Construction llc Marine construction
Custom Boathouses
Dock and pier construction
Bulkhead installation
Retention

10/09/2026

🌊 Built for the Water. Designed for the Storm. 🌀

Hurricane season puts your dock to the test!

ThruFlow decking panels feature an open-grid design that allows water to pass through the dock surface, helping reduce uplift pressure from storm surge and rising water.

Unlike traditional solid decking, ThruFlow panels allow water to flow through instead of trapping pressure beneath your dock.

✅ Helps reduce hydrostatic uplift forces
✅ Allows storm surge and wave water to pass through
✅ Durable, slip-resistant decking
✅ Ideal for waterfront docks and piers

While no dock is hurricane-proof, choosing the right materials can make a big difference.

Decks and Docks Lumber Co
ThruFlow Premium Decking Solutions

10/06/2026
When a customer is hanging a new 46’ Valhalla, you don’t build the lift setup halfway.Our crew installed a custom MYCO c...
09/21/2026

When a customer is hanging a new 46’ Valhalla, you don’t build the lift setup halfway.

Our crew installed a custom MYCO cradle paired with a 40,000 lb Hi-Tide boat lift—built to handle a serious offshore machine the way it should be handled.

Big boat. Big lift. Custom cradle. Heavy equipment. No shortcuts.

This is the kind of work that separates companies that install boat lifts from companies that know how to build marine infrastructure for boats most people only dream about owning.

At Fair Tide Marine & Construction, we bring the equipment, the manpower, and the experience to take on the jobs that make other crews start looking for excuses.

46’ Valhalla. 40K Hi-Tide. Custom MYCO cradle.
That’s a heck of a combination.

And another one going in the air.

Fair Tide Marine & Construction
Built for the big stuff.







Another big upgrade underway for one of our existing customers!Fair Tide Marine & Construction is installing a new 40,00...
09/18/2026

Another big upgrade underway for one of our existing customers!

Fair Tide Marine & Construction is installing a new 40,000 lb Hi-Tide boat lift, and this project involves a lot more than simply swapping out the lift.

To make it happen, our crew is:

• Removing a portion of the existing boathouse roof for access
• Pulling existing pilings to open up the work area
• Installing larger pilings engineered to support the new 40,000 lb lift
• Installing the new Hi-Tide lift system
• Rebuilding the boathouse around the new lift and tying everything back together

Projects like this require careful planning, the right equipment, and a crew that understands how to modify an existing waterfront structure without cutting corners.

When it’s finished, this customer will have a boathouse rebuilt around a serious lift system designed to handle a much larger vessel for years to come.

Fair Tide Marine & Construction
Built for the Gulf Coast. Built to last.

Anybody remember the Montjoy project in Diamondhead? 👀Here’s a before-and-after look at how far this project has come. P...
09/18/2026

Anybody remember the Montjoy project in Diamondhead? 👀

Here’s a before-and-after look at how far this project has come. Proud of the transformation and the work our Fair Tide Marine & Construction crew put into it.

If your waterfront property is ready for an upgrade, repair, or complete transformation, give us a call. Let’s talk about what we can build for you.




⚓ DON’T WAIT UNTIL NEXT SUMMER TO GET SUMMER-READY! ⚓Summer may be winding down, but FTMC’s winter schedule is filling u...
08/27/2026

⚓ DON’T WAIT UNTIL NEXT SUMMER TO GET SUMMER-READY! ⚓

Summer may be winding down, but FTMC’s winter schedule is filling up fast!

Now is the time to secure your spot for:

🔹 Boathouse repairs & maintenance
🔹 Boat lift service, repairs & upgrades
🔹 Dock repairs & improvements
🔹 Complete new boathouse & lift builds
🔹 Full marine construction projects

Winter is the perfect time to take care of the work so when next summer rolls around, your waterfront is ready and waiting for you — not stuck on a construction schedule.

Whether you need a little maintenance or want to start from scratch with a completely new build, get on Fair Tide Marine & Construction’s winter schedule now.

📅 Reserve your spot today — our winter list is filling quickly!

FAIR TIDE MARINE & CONSTRUCTION
Build it this winter. Enjoy it all summer. âš“

âš“ PROJECT UPDATE | MARSH ISLAND RESERVEAnother major waterfront project is nearing completion for Fair Tide Marine & Con...
08/21/2026

âš“ PROJECT UPDATE | MARSH ISLAND RESERVE

Another major waterfront project is nearing completion for Fair Tide Marine & Construction.

We’re putting the finishing touches on the new Marina at Marsh Island Reserve, designed specifically for neighborhood homeowners who don’t have direct waterfront access — giving them their own place to keep their boats and enjoy everything that comes with living on the water.

Once complete, the private marina will feature individual docks, boat lifts, shore power and water, along with a commons area and gazebo on the adjacent property for residents to enjoy.

The marina is just one part of a much larger scope of work Fair Tide has completed at Marsh Island Reserve. Our team developed approximately 600 feet of waterfront, including construction of a new bulkhead, two boathouses, and the neighborhood marina.

From shoreline development and bulkheads to docks, boathouses and complete marina construction, this project is a great example of our ability to take a waterfront development from concept to completion.

We’re proud of how this one is coming together and even more proud of the Fair Tide crew making it happen.

600’ OF WATERFRONT. ONE COMPLETE MARINE DEVELOPMENT.

âš“ Fair Tide Marine & Construction
Built on the Coast. Built to Last.

âš“ PROJECT UPDATE | MONTJOY BOARDWALK & BIRD OBSERVATORYFair Tide Marine & Construction is proud to continue production o...
08/21/2026

âš“ PROJECT UPDATE | MONTJOY BOARDWALK & BIRD OBSERVATORY

Fair Tide Marine & Construction is proud to continue production on the Montjoy Boardwalk and Bird Observatory in Diamondhead, Mississippi.

This project includes approximately 580 linear feet of boardwalk, measuring 8 feet wide and 8 feet tall, creating a durable and accessible structure designed to connect visitors with the surrounding coastal environment.

Our crew continues to make steady progress, delivering quality marine construction built to withstand the demands of the Gulf Coast.

We appreciate the opportunity to be part of this project and look forward to seeing the Montjoy Boardwalk and Bird Observatory take shape.

Built on the Coast. Built to Last.

âš“ Fair Tide Marine & Construction

Address

Biloxi, MS
39532

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+12283824070

Alerts

Be the first to know and let us send you an email when Fair Tide Marine & Construction llc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fair Tide Marine & Construction llc:

Shortcuts

Sponsored

Share

Category