09/12/2026
Basement remodel in the works. Drop ceilings are in, walk-in closet built, non load-bearing wall deleted. Next up is new hvac system, plumbing and electrical, tray ceiling build, drywall throughout, kitchen cabinets, and more. Thankful to be indoors for a while.