06/09/2026
I went today to clean out the NHMS suite we're doing for EJ Prescott. This is before the painter works his magic. We need to come back once he sprays everything out lay the flooring and tile the backsplashes etc. This was a major renovation even though it looks cut and dry alot of design and behind the scenes work got put in. The trim is almost all pocket screwed and glued together to hopefully keep everything in place for the long hual. The suites are tricky to work on because theres alot of steel framing, structural steel, concrete, to deal with and they are designed to move so we need to ensure our work is fastened really well so it doesn't become a maintenance headache. Hopefully in the next month or so i can post a video of it all finished up! Per usual Erich Petty Painting is going to make everything look wonderful for us!