1256 Project Update 🔧
Sewer line excavation continued this week, along with storm drain digging and backfilling operations throughout the site. Crews prepared sewer manholes, backfilled around two manholes, installed the bypass, and completed slurry pours to keep progress moving safely and efficiently. The trench is fully shored with the proper shoring.
Shoutout to the crew getting it done 👷♂️