12/19/2020
This week we completed our project at the City of Altus water treatment plant. The 450KW generator has been waiting on the main wiring to be rerouted thur the new 1200A transfer switch. Cope plumbing completed their part by installing a 3” gas line and regulator. Centerpoint energy will be installing the gas meter the week after Christmas. The generator will be on line the 4th of January.