10/13/2026
Fall is pond season. The ground firms up, water levels drop, and it's the right time to fix that washed-out spillway or the creek crossing your cattle have been tearing up all summer.
We have 50,000 tons of Flint Hills limestone rip rap ready to load. It's heavy, angular stone that locks together and holds up against moving water on pond dams, overflow channels, culvert outlets, creek banks and cattle crossings.
Our stone is mechanically extracted, not blasted, so it comes out solid and ready to work.
Tell us where it's going and we'll quote the stone plus freight to your zip. Call (785) 262-9064.