Team Ultimate Edge and Team Masterbuilt Surfaces layed down a great 24k Sq Ft slab this week, despite some big challenges. No entry from the back so rider trowels were pre-hung from chain hoists, lots of pipes and columns, Late concrete, slow service, concrete pump main hydraulic pump failure mid pour (Hoosier Concrete Pumping did a fantastic job and had another pump there and running within 30 minutes, screed busted a hydraulic line…. Yet we overcame and delivered another excellent floor! Ozinga Hoosier Concrete Pumping Somero Enterprises Stan Chupp