Stefan Lynch Construction

Stefan Lynch Construction From small home remodeling to New Home building. No Job is to small, nor too big.

Zimmer
12/31/2016

Zimmer

1510 American Way New Laminate Flooring
12/26/2016

1510 American Way New Laminate Flooring

Jim Brown Garage
11/16/2015

Jim Brown Garage

Burnette Stucco Patch and Paint
11/16/2015

Burnette Stucco Patch and Paint

Stefan Lynch Construction's cover photo
12/15/2014

Stefan Lynch Construction's cover photo

Stefan Lynch Construction
12/15/2014

Stefan Lynch Construction

Still in progress. Rotted frameing, black molded drywall through out.  Cure: Gut the entire bathroom.  Client wanted to ...
09/20/2014

Still in progress. Rotted frameing, black molded drywall through out. Cure: Gut the entire bathroom. Client wanted to make the bathroom wider. Because of the extensive amount of rotted framing, that was all removed, then reframed and added an extra foot of width to the entire bahroom. The room was created from the master Bedroom. Afterwards, repoured a new shower pan, tiled bathroom, makeup room, then installed laminate flooring master bedroom. Of course, Paint and texture as needed, repairs to the master bedroom walls were made, Next will be tackling the guest bathroom, removing white and gold 4" tile from the walls, reinstalling new drywall, removing wall paper, and texture and paint. Also had to fix plumbing in the walls, that caused the extensive damage in the first place, Client loves the work.

New Interior wall and new flooring.
09/10/2014

New Interior wall and new flooring.

My kids had destroyed the top to this.  Marker, gouges, nail polish, dings, etc.
05/26/2014

My kids had destroyed the top to this. Marker, gouges, nail polish, dings, etc.

Before pictures are the blueish gray with tan/brown on bottom, and carpet.  There is also a bathroom attached to this th...
03/11/2014

Before pictures are the blueish gray with tan/brown on bottom, and carpet. There is also a bathroom attached to this that I didnt take pictures of, but same thing

Remodeled is the solid beige walls and VCT Industrial Tile. Start to finish about 100 hours from removal of the carpet and linoleum in the bathroom. All new trim installed, torn out wallpaper, floated, patched, textured and painted. It so brightens the room and brings this Office to modern, not a throwback from the 70's. New Cabinets will be forthcoming in the future.

Stripped wallpaper, textured and painted, tiled and grout, custom built vanity, new  plumbing and electrical, new toilet...
01/06/2014

Stripped wallpaper, textured and painted, tiled and grout, custom built vanity, new plumbing and electrical, new toilet.

Rouse New
12/31/2013

Rouse New

Fillmore Office
12/31/2013

Fillmore Office

Fraley Job
12/14/2012

Fraley Job

Rouse Job
12/14/2012

Rouse Job

Church Job
12/14/2012

Church Job

Robertson Job
12/14/2012

Robertson Job

Address

2517 Stanford Ave
Alamogordo, NM
88310

Telephone

(575) 491-3640

Alerts

Be the first to know and let us send you an email when Stefan Lynch Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Stefan Lynch Construction:

Category

Nearby contractors